Engine change delays ispace-built lunar lander mission

 [[{“value”:”A change in engines will cause the launch of a lunar lander being built for a NASA-funded mission to slip from 2026 to 2027.
The post Engine change delays ispace-built lunar lander mission appeared first on SpaceNews.”}]]

 [[{“value”:”

A change in engines will cause the launch of a lunar lander being built for a NASA-funded mission to slip from 2026 to 2027.

The post Engine change delays ispace-built lunar lander mission appeared first on SpaceNews.

“}]] 

Related Posts

Recent Events

Scroll to Top